This page requires JavaScript
OPEN PUBLIC CONSULTATIONS
CLOSED PUBLIC CONSULTATIONS
GAS
ELECTRICITY
Non-harmonised RES
ERI Benchmarking report
Draft FG on CACM for Elec.
Comitology Guideline Elec. Trans.
Pilot FG on Elec. Grid Connection
Electricity Generation Adequacy
Elec. cross-border trade incentives
Smart Grids
Elec. 10-year network dev. plan
Integration of Wind Generation
GGP Elec. Grid connection & Access
New GGP Balancing Mkts. Integration
2008 Compliance Monitoring
Treatment of Losses
GGP Operational Security
2008 ERI Coherence & Convergence
2007 ERI Coherence & Convergence
Voltage Quality
CBF for infrastructure
GGP Balancing
Inter-TSO Compensation Guidelines
GGP Transparency
Congestion Mgtm. Guidelines
Transmission Tarification Guidelines
CROSS-SECTORAL
CUSTOMERS
E08-PC-32: Regulation (EC) 1228/2003 Compliance Monitoring, Second Report 2008
ERGEG Public Consultation
2008/09/17 - 2008/11/12
Background
Consultation Documents
Public Responses
Public Hearings
Documents under Public Consultation
E08-ENM-03-05a
Cover Note to the Public Consultation on the Regulation 1228/2003 Compliance Monitoring, Second Report 2008
Document Size: 29041 bytes
E08-ENM-03-05
2008 Compliance Monitoring Report, 10 September 2008
Document Size: 602903 bytes
Outcome of the Public Consultation
E08-ENM-03-05c
ERGEG Conclusions Paper on the Regulation (EC)1228/2003 Compliance Monitoring, Second Report 2008. February 2009
Document Size: 148974 bytes