This page requires JavaScript
OPEN PUBLIC CONSULTATIONS
CLOSED PUBLIC CONSULTATIONS
GAS
ELECTRICITY
Non-harmonised RES
ERI Benchmarking report
Draft FG on CACM for Elec.
Comitology Guideline Elec. Trans.
Pilot FG on Elec. Grid Connection
Electricity Generation Adequacy
Elec. cross-border trade incentives
Smart Grids
Elec. 10-year network dev. plan
Integration of Wind Generation
GGP Elec. Grid connection & Access
New GGP Balancing Mkts. Integration
2008 Compliance Monitoring
Treatment of Losses
GGP Operational Security
2008 ERI Coherence & Convergence
2007 ERI Coherence & Convergence
Voltage Quality
CBF for infrastructure
GGP Balancing
Inter-TSO Compensation Guidelines
GGP Transparency
Congestion Mgtm. Guidelines
Transmission Tarification Guidelines
CROSS-SECTORAL
CUSTOMERS
E08-PC-31: ERI Coherence and Convergence Report 2008
ERGEG Public Consultation
2008/09/16 - 2008/11/11
Background
Consultation Documents
Public Responses
Public Hearings
Documents under Public Consultation
E08-ERI-13-03a
Cover Note to the Public Consultation on the 2008 ERI Coherence and Convergence Report
Document Size: 28402 bytes
E08-ERI-13-03
2008 ERI Coherence and Convergence Report
Document Size: 369217 bytes
Outcome of the Public Consultation
E08-ERI-19-04
Second ERI Coherence and Convergence Report - an ERGEG Conclusions Paper, 11 March 2009
Document Size: 185218 bytes
DOWNLOAD ALL FILES