login
calendarsearchsitemaplost passwordregister
 
 
 
 
 
   OPEN PUBLIC CONSULTATIONS
   CLOSED PUBLIC CONSULTATIONS
     GAS
       Gas Target Model
       Gas target model - call for evid.
       FG on gas balancing
       CAM & CMP efft. storage access
       Gas Transparency
       Pilot FG Gas CAM / CMP
       10-year gas network dev. plan
       ERGEG Principles: CAM & CMP
       Article 22 - Exemptions to TPA
       GGPLNG
       Principles gas tariff calculation
       Gas Transparency Monitoring
       Capacity Calculation
       GRI Convergence
       Secondary Markets
       GGP Open Season
       Transmission Pricing
       GGP Balancing 2006
       Monitoring GGPSSO
       Roadmap to competitive mkts.
       GGP Balancing 2005
       GGP Storage System Operators
     ELECTRICITY
     CROSS-SECTORAL
     CUSTOMERS
E07-PC-19: Secondary Markets  
ERGEG Public Consultation 2007/05/10 - 2007/07/04

  
    Background     
    Consultation Documents     
    Public Responses     
 

On 10th May 2007 ERGEG launched a public consultation on Secondary Markets – the way to deal with contractual congestion on interconnection points

Secondary markets for capacity rights are an important vehicle for capacity re-trading and thus provide for access to natural gas transmission systems within the borders of the EU. Effective secondary markets can be considered an important congestion management tool.

A study by regulators in the North West gas Regional Energy Market of the Gas Regional Initiative (GRI) shows that there are no liquid secondary markets for transmission capacity at North West European cross-border interconnection points. This is backed up by the findings of the Energy Sector Inquiry of the European Commission (January 2007), which covers the whole EU.

The objective of this ERGEG public consultation paper is to invite the views of stakeholders on:
 

  • Whether the findings of the study for the North-West Region of the GRI with regard to the performance of the secondary market could or should reflect the performance of secondary markets in the rest of Europe
  • If yes, whether the recommendations provided in this paper are applicable to the Europe Union.

This ERGEG public consultation paper suggests the following solutions for improving secondary market liquidity:

  • establishment of a platform for the trade in secondary capacity rights which facilitates auctions of secondary capacity rights (e.g. (e.g. pilot project at the Bunde and Ellund interconnection points).
  • stricter application of firm Use It or Loose It (UIOLI) on the primary market for all contracts including legacy contracts.

ERGEG invites all interested parties to comment on issues raised in the text.  Any comments should be received by 4th July 2007 and should be sent by e-mail to: secondarymarkets@ergeg.org

Any question to this document should in the first instance be directed to: 

             Mrs Fay Geitona
             Email: fay.geitona@ceer-eu.org
             Tel. +32 2 788 73 30
             Fax +32 2 788 73 50

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 




 
       
DOWNLOAD ALL FILES