Public responses received:
In addition ERGEG has received two confidential responses
|
Principles on Calculating Tariffs for Access to Gas Transmission Networks
26 November 2007 - 18 January 2008
|
Regulation 1775/2005/EC calls for convergence of tariffs structures and charging principles where different TPA tariffs may result in a restriction of market liquidity or a distortion of cross border trade. In order to provide TSOs and NRAs with some guidance ERGEG has prepared the Principles on Calculating Tariffs for Access to Gas Transmission Networks – An ERGEG Public Consultation Paper [E07-CBT-01-03]. This Paper has been drafted taking into account the results of ERGEG 2006 public consultation on “Transmission Pricing (for Transit) and how it interacts with Entry-Exit Systems” [E06-GFG-18-03], which recommended developing guidelines for calculating transmission tariffs. The set of principles established in this Consultation Paper seeks cost reflective, transparent and non-discriminatory TPA tariffs and it addresses the following issues: (i) costs principles; (ii) tariffs principles; (iii) incentives for new infrastructure; and (iv) the criteria for assessing pipe -to- pipe competition.ERGEG requests stakeholder views on the adequacy of tariff principles and incentives for new infrastructure established in this Consultation Paper. In addition, ERGEG asks for stakeholders to: (i) outline other tariffs and cost principles in place; and (ii) outline further incentive concepts for new infrastructure.ERGEG invites all interested parties to comment on the understanding and issues raised in this paper. Any comments should be received by 18 January 2008 and should be sent by email to: gastariffs@ergeg.org Following the end of the public consultation period, ERGEG will publish all comments received from stakeholders. Any respondents wishing ERGEG to treat its contribution as confidential should clearly state this in their reply and endeavor to give any confidential material in annexes that can be separated from publishable non-confidential material.Any questions relating to this document should in first instance be directed to: Mrs. Fay Geitona Tel: +32 2 788 73 30 Fax: +32 2 788 73 50 Email: fay.geitona@ceer.eu
|
E07-CBT-01-03
Principles on calculating tariffs for access to gas transmission networks |
 |