ARCHIVE
     GAS
     ELECTRICITY
     CUSTOMER
     ENERGY
Public Consultation
ERGEG Guidelines for Good Practice on Open Season Procedures 
 (Ref: C06-GWG-GWG-29-05c), 21 May 2007
ERGEG's Guidelines following an ERGEG public consultation process, held in 2007
Evaluation of the Comments Received to the public consultation 
 (Ref: C06-GWG-29-05b) to the ERGEG Public Consultation on GGP on Open Season Procedures
C06-GWG-29-05 
 Draft Guidelines of Good Practice for Open Season Procedures (GGPOS), 6 December 2006

Responses received:
EGL
 


On 7 December 2006 the ERGEG launched a public consultation on  Draft Guidelines of Good Practice for Open Season Procedures.  Open season procedures generally consist of a two-step process starting with an open assessment of market demand for a specific proposal (first step) and a subsequent phase of capacity allocation (second step).

These draft Guidelines were prepared on foot of a request of the  European Commission at the 11th Madrid Forum (18-19 May 2006).   The guidelines aim at clarifying the role of open season procedures in light of Commission’s draft explanatory notes on Article 5 (1 – 5) as well as Annex 2.1 and 2.2 of Regulation 1775/2005/EC.

ERGEG invites all interested parties to comment on issues raised in the text.  If a respondent would like ERGEG to treat their submission with confidentiality, this must be explicitly mentioned.

Any comments should be received by 19 January 2007 and should be sent to openseason@ergeg.org

Any question to this document should in first instance be directed to:

         Mrs Fay Geitona
         Email: fay.geitona@ceer-eu.org

         Tel. +32 2 788 73 30
         Fax +32 2 788 73 50
 

-