| Public Consultation on 3rd SG documents, June 2007 (Last Updated: 23-AUG-10)
|
 |
For further information on the 3rd SG meeting, see Meetings, 3rd South SG meeting
|
 |
Priority 1. TSO study on the current interconnection problems between France and Spain until 2015
| |
|
| Gas natural comments on first priority |
Priority 2. Shippers study on the current interconnection problems between France and Spain
| |
|
| CRE comments on the second priority: interoperability issues |
Priority 3. Regulators analysis of the current level of transparency for the Spanish and the French transmission, LNG and storage system operators
| |
|
| Gaz de France DGI comments on the transparency report |
| Shippers comments on transparency |
Comments on the three priorities
| |
|
| GRTgaz comments on the three priorities |
Enagas comments on the three priorities
|
 |